From P&ID to a FAT-ready process simulator
Upload your P&IDs and get an instrument list and draft I/O list back in minutes. When the panel is ready for FAT, we build the simulator that drives it, without writing simulation logic into your PLC program.
- Input
- P&ID PDF, vector or scanned
- Output
- Instrument list · I/O list · sim config
- Target
- Logix 5000 over EtherNet/IP
- Simulators
- Flat rate by tag count
| Tag | Service | I/O | Signal |
|---|---|---|---|
| LT-100 | TK-100 level | AI | 4–20 mA |
| LSHH-100 | TK-100 high-high level | DI | 24 VDC |
| P-101 | Transfer pump run command | DO | 24 VDC |
| P-101 | Transfer pump running | DI | 24 VDC |
| FT-101 | Transfer flow | AI | 4–20 mA |
| FCV-101 | Transfer flow control valve | AO | 4–20 mA |
One drawing set, two ways to use it
Start with the drawings you already have. The I/O list tool turns them into lists in minutes, on your own. When it's time for FAT, the same list becomes the simulator that drives your panel.
- Upload
P&ID PDFs
Exported from CAD or scanned. One sheet or the whole set.
I/O list tool - Extract
Instrument list
Every ISA tag on every page, with service, loop and I/O type.
I/O list tool - Draft
I/O list
Hardwired points by type, including implied ones like a pump's run command.
I/O list tool - Build
Simulator
Device and process models for every tag. Flat rate by tag count.
Simulator service - Test
FAT on your PLC
Runs over EtherNet/IP beside your controller. Inject faults on demand.
Simulator service
P&ID → instrument list and I/O list
Upload P&ID PDFs and download the lists you'd otherwise build by hand from the drawings, sheet by sheet.
It's a first pass, not a checked list. Every row says how the tag was found and how sure the read is, so checking it against the drawing is faster than starting from a blank spreadsheet.
Vector PDFs exported from CAD are read straight from their text layer, so tag text comes through exactly as drawn, including stacked bubble text like FT over 101.
Scanned sheets are read with AI vision. Each sheet is split into overlapping tiles so small bubbles stay legible, then the results are merged and de-duplicated per page.
| Pg | Tag | Function | Service | I/O | Sim device | Found by |
|---|---|---|---|---|---|---|
| 1 | LT-100 | Level transmitter | TK-100 level | AI | transmitter | text + vision |
| 1 | LSHH-100 | Level switch, high-high | TK-100 high-high level | DI | switch | text + vision |
| 1 | FT-101 | Flow transmitter | Transfer flow | AI | transmitter | text |
| 1 | FIC-101 | Flow indicating controller | Transfer flow control (in PLC) | — | — | vision |
| 1 | FCV-101 | Flow control valve | Transfer flow control valve | AO | control_valve | text + vision |
Page, tag, function letters, loop, measured variable, function, service, equipment or line, I/O type, confidence and how each tag was found.
Hardwired points by tag and type: AI, AO, DI, DO. Points implied by equipment, such as a pump's run command and running feedback, are marked as implied.
One simulator device per tag, mapped to its I/O. It's the starting point if you want a FAT simulator built.
Pay per page
What happens to your drawings
- Your PDF is deleted as soon as its job finishes.
- Results are deleted after 30 days, so download what you need.
- Files are only ever served to the account that uploaded them.
- Scanned sheets are read with Anthropic's Claude API. Under Anthropic's commercial terms, API inputs aren't used to train their models.
- Payments go through Stripe. Your card number never reaches us.
FAT simulators for Logix, built from your P&IDs
A process simulator that runs on a PC beside the panel and talks to your controller over EtherNet/IP. It reads the outputs your program writes, strokes the valves, runs the pumps, fills the tanks, and writes back the inputs your program expects.
No simulation logic in your program
Your program gets a small, standard interface instead: flat SIM_* I/O image tags, a heartbeat watchdog and an I/O-mapping routine that switches inputs between the real modules and the simulator. The process models live outside the controller, so there's no sim logic to dig out of your code before start-up.
What it models, and what you can break on purpose
Inject a fault during the test to prove the interlock trips and the alarm comes in, then clear it and carry on.
| Device | What it models | Faults you can inject |
|---|---|---|
| On/off valve | Open and close stroke times, open and closed limit switches | Stuck · open limit fails · closed limit fails |
| Control valve | Position follows demand at the valve's stroke rate | Stuck |
| Motor / pump | Start and stop delays, running feedback, motor amps from load | Fails to start · fails to stop · trips |
| Transmitter | Scaling to raw counts, lag and noise | Fails high (21.0 mA) · fails low (3.6 mA) · freezes |
| Switch | Setpoint, direction, deadband and fail-safe wiring | Stuck active · stuck inactive |
| Tank | Level from inflow and outflow, with full and empty | — |
| Flow path | Flow from pumps running and valves throttling | Blocked |
| Custom | Vendor packages and sequenced equipment, described in configuration | Frozen · held |
It only writes when your controller says so
- SIM_Enable must be set in the PLC. Clear it and the simulator stops writing.
- The controller name must match the project, so it can't drive the wrong PLC.
- A heartbeat watchdog in the PLC drops simulation if the simulator stops updating.
- It writes only the simulated input images and the heartbeat, plus any tag you explicitly bind.
- A commissioning checklist takes the sim hooks out before SAT and start-up.
How a project runs
- Scope. Send your P&IDs or I/O list. We count the tags and fix the price before any work starts.
- Build. We model every device and the process between them. You add the SIM interface tags and two short routines to your program.
- Check. We run the simulator against your program before FAT and tune it with you.
- FAT. Test against the simulator, with faults on demand.
- Remove. Follow the checklist to take the sim hooks out before SAT.
Flat rate by tag count
A tag is one field device the simulator models: a transmitter, a switch, a valve or a motor. LT-100 is one tag. P-101 is one tag, even though it has a run command and a running feedback.
| Size | Tags | Flat rate | Typical scope |
|---|---|---|---|
| Skid | Up to 40 | $4,800 | A packaged skid or a single process unit |
| Unit | 41–120 | $8,900 | A process area on one controller |
| System | 121–300 | $15,900 | Several areas or a full small plant |
| Plant | Over 300 | Quoted | Fixed price, agreed per project |
- A simulator project built from your P&IDs and I/O list
- Device and process models for every tag in the tier
- Fault injection on every device
- PLC interface tags and routines, with install notes
- A check run against your program before FAT
- One round of changes before FAT
- On-site FAT support
- Changes after FAT
- Reuse for SAT and operator training
Why not write the sim in the PLC?
That's how most FATs get simulated: someone writes sim routines into the program, the FAT runs on them, and then they all have to come out before start-up. Work the comparison with your own numbers.
Built by a controls engineer
Clear Slate is a small controls engineering practice focused on Allen-Bradley ControlLogix and CompactLogix systems. Both tools come from the same problem every FAT has: the field isn't there yet, and somebody has to fake it.
The I/O list tool takes the typing out of the first pass. The simulator takes the sim logic out of your program. When you scope a simulator, you talk to the engineer who builds it.
Scope a simulator
Tell us about the project and we'll reply with questions or a fixed price. Rather just email? Write to hello@clear-slate.com.